Refine your search:     
Report No.
 - 
Search Results: Records 1-4 displayed on this page of 4
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

Study of decommissioning cost evaluation technique for nuclear reactor dismantlement; Calculation of decommissioning cost by COSMARD

Oshima, Soichiro; Shiraishi, Kunio; Shimada, Taro; Sukegawa, Takenori; Yanagihara, Satoshi

JAERI-Tech 2005-046, 46 Pages, 2005/09

JAERI-Tech-2005-046.pdf:3.43MB

A model for estimating decommissioning costs consisting of labor cost, device cost and expense, was developed for items which OECD/NEA had standardized, and was installed into the computer system for planning and management of reactor decommissioning (COSMARD). Input data files and databases for the decommissioning of JPDR were prepared, and the decommissioning cost was calculated with COSMARD. In addition, the decommissioning cost for a large scale BWR power plant was also calculated on the assumption of the advantage of scale. The calculations have shown that it is useful and efficient for studying the decommissioning costs for nuclear reactors to apply the COSMARD with database for cost estimation to the decommissioning cost calculation.

JAEA Reports

Development of computer systems for planning and management of reactor decommissioning; A Study on influence of work difficulty factors on project management data and simplification of work breakdown structures (Contract research)

Oshima, Soichiro; Sukegawa, Takenori; Shiraishi, Kunio; Yanagihara, Satoshi

JAERI-Tech 2001-086, 83 Pages, 2001/12

JAERI-Tech-2001-086.pdf:5.23MB

Project management data on dismantling the Japan Power Demonstration Reactor (JPDR) was calculated using the Code System for Planning and Management of Reactor Decommissioning (COSMARD), and then its validity was studied by comparing the calculation results with actual data. In addition, work breakdown structure models and database were modified to meet an evaluation with changing work difficulty of preparation and cleanup activities, and calculations were further conducted to analyze feasibility by changing various conditions on cutting and conditioning activities. As the results, COSMARD was verified to be useful by confirming calculation capability on reflection of actual work conditions and relatively good agreement between actual data and calculations. Moreover, it was cleared that main parameters such as work difficulty of preparation and cleanup activities and the cutting speed in demolition work could affect to manpower within 30% in each calculations.

Journal Articles

Systems engineering for decommissioning the Japan Power Demonstration Reactor

Yanagihara, Satoshi; ; ; Fujiki, Kazuo

1st JSME/ASME Joint Int. Conf. on Nuclear Engineering, p.65 - 70, 1991/00

no abstracts in English

4 (Records 1-4 displayed on this page)
  • 1